Originally, the Jai Hind metro station was prepared to become elevated. Even so, the AAI objected which the elevated stretch up into the airport could possibly pose a menace to plane, so the route was further more reworked as well as the station was shifted underground, 150 m through the Airport https://railwayrecruitment46912.bloggerbags.com/37370732/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf