A further note: the popular serpentine route on the Salzberg will continue being closed till the tip of the construction perform. Design perform will start off on 1 September 2025 and will last until early summertime 2026. During this time, the salt mine (salt mine) along with the Skywalk above https://alexanderl395qtw5.vigilwiki.com/user